We have taken up GMP upgradation in a manfold manner. We have concentrated our efforts on
Asphalt roads – 600 m2 approx length
An excellent water system – Purified water system consisting of sand bed; Micron filter; RO system with two membranes; mixed bed and final collection of 500 liters closed SS storage Tank with jacket. Circulation system with SS loops line with UV lamp and micron filters.
Adding storage space of 400 m2 inorder to be GMP compliant
Replacing all doors and windows with GMP compliant heavy duty doors to maintain good pressure differentials – an essential GMP requirement
Replacing of floors where necessary with Epoxy flooring in sterile areas
All core production areas to have polyurethane / epoxy painting
Adding equipment such and HPLC and stability chambers
Improving the skills of people in all GMP areas with the help of a consultant
Bringing up the documentation to be in line with current GMP requirements